Submitted By:
Luz Wendy Noble
Case Study:
No
It is a long-term deal that may add up to the firm's marginal profit.
The long-term Power Purchase Agreement (PPA) for Bangladesh clinched by Sembcorp Gayatri Power Limited (SGPL) power plant could narrow down SGPL’s losses, DBS Equity research said.
The contracted capacity represents around 19% of SGPL’s 1,320MW design capacity, which currently runs on short-term power contracts.
read more